Home > Nuclear Industry

Hualong One (HPR1000) Demonstration Project

Updated:2021-12-26 | By:The Academy of Contemporary China and World Studies

Hualong One (HPR1000) Demonstration Project 

Hualong One (HPR1000) is a 1,000 MWe-class advanced pressurized water reactor jointly developed by China National Nuclear Corporation (CNNC) and China General Nuclear Power Corporation (CGN). It is mainly characterized by a 177-fuel-assembly core, resistance to aircraft impact, multiple redundant safety systems and combination of active and passive safety measures. Its safety performance and technical indicators have met the international standards on Gen III nuclear power technology. As part of the demonstration project, the construction of units 5 and 6 at Fuqing in Fujian Province started on May 7, 2015; and the construction of units 3 and 4 at Fangchenggang (Phase II) in Guangxi Zhuang Autonomous Region kicked off on December 25, 2015. On January 30, 2021, Fuqing Unit 5, the first of its kind in the world, was put into commercial operation. With a construction period of 68.8 months, it recorded the shortest construction time for the first reactor of Gen III nuclear power plants in the world. 

福清核電站5、6號機組
Units 5 & 6 of Fuqing NPP

華龍一號示范工程

華龍一號是中國兩大核電企業中國核工業集團公司和中國廣核集團公司自主研發的百萬千瓦級先進壓水堆核電技術。華龍一號以 177組燃料組件堆芯、抗大飛機撞擊、多重冗余的安全系統、能動與非能動相結合的安全措施為主要技術特征,安全性能和技術指標滿足國際三代核電技術標準。作為華龍一號示范工程, 2015年 5月 7日,福建福清核電站 5、6號機組正式開工建設; 2015年 12月 25日,廣西防城港核電二期 3、4號機組正式開工建設。 2021年 1月 30日,華龍一號全球首堆——福清核電站 5號機組投入商業運行,并以 68.8個月的建設工期,創造全球三代核電首堆建設最短工期紀錄。